Thesis Work Plan. Reconstruction of the «Trud» Cinema in Slantsy

PROTECT STATUS: not protected

The final project plan focuses on the reconstruction of the «Trud» cinema in Slantsy—a lost piece of cultural heritage that requires restoration.

1. Thesis Topic

Renovation of the «Trud» Cinema in Slantsy

2. Location

Original size 3500x2400

Location of the cinema in the Luchki district

Original size 1208x658

Situational Plan

3. Photography and Historical Overview

The «Trud» Cinema—a two-story, widescreen cinema—opened in 1961, but it permanently closed in the early 2000s due to an economic crisis and now stands in a state of disrepair.

The building was constructed according to a standard Soviet design from that era—in the style of what is known as «Stalinist Empire,» merging with the emerging Soviet monumental modernism. The facade is adorned with massive columns that still serve as a reminder of the building’s former grandeur. The name «Trud» (Labor) fit perfectly with the ideology of the mining region. The cinema quickly became a focal point, as it was widescreen—a cutting-edge technology for those times.

4. Building Blueprints

Original size 3500x2400
Original size 3500x2400

5. Problems and Objectives

Problems

  1. FUNCTIONALLoss of the building’s function and its architectural degradation2. INFRASTRUCTURALLimited number of movie theaters and entertainment centers for young people in the city3. SOCIO-CULTURALDeterioration of cultural and social value in the eyes of the city’s residents

Objectives

  1. ARCHITECTURALReimagine the building’s architecture, making it more attractive externally and modern internally.2. TERRITORIALBeautify the area in front of the cinema to draw in visitors.3. SOCIALCreate a new point of attraction for city residents.4. COMMUNICATIONALExpand the target audience: Make the cinema not only for adults but also for children by adding entertainment features.

6. Work Plan

Phase 1. September — November
[Preparatory Stage]

— Thesis Approval — Pre-design Analysis — Material Gathering — Analysis of Realized Projects — Documentation Collection — Defining the Spirit of Place and Time

Phase 2. November–December
[Conceptual Component]

— Drafting the technical specification — Developing and approving the concept — Developing the zoning plan — Master plan of the territory

Phase 3. January — February
[Project Phase]

— Concept Approval — Design Brief Development — Layout Development — Project Graphics Work — Development of Spatial Solutions

Phase 4. March–May
[Presentation Stage]

— Space Planning — Project Graphics Development — Spatial Visualization — Presentation Layout

7. «Factory» and Certification

0
1/2
Thesis Work Plan. Reconstruction of the «Trud» Cinema in Slantsy
Project created at 18.10.2026
More projects in interior design
Viktoriya Bembeeva Алексеевна
Локация: Набережная лейтенанта Шмидта, Санкт-Петербург. Концепция проекта: Дизайн-проект общественного туалета основан на принципах минимализма, эргономики и модульности. Главная концептуальная задача — через архитектурно-планировочные решения отразить линейность набережной. Четкая геометрия, горизонтальные членения фасада и ритмичное расположение модульных элементов создают визуальную связь с протяженным характером городского фронта.
cgrave
Portfolio CG Rave — это открытая площадка для авторских портфолио 3D художников. Размещайте свои работы, чтобы их заметили в сообществе CG, ваши будущие коллеги и потенциальные заказчики.
portfolio
tutorials
media